NEW QUESTION # 37
How can you define the overhead rate in a costing sheet? Note: There are 2 correct answers to this question.
- A. As equivalence number
- B. As lot-based surcharge
- C. As percentage rate
- D. As quantity-based surcharge
Answer: C,D
NEW QUESTION # 38
Which default values can you configure for the product cost collector? Note: There are 2 correct answers to this question.
- A. Costing variant for preliminary costing
- B. Result Analysis (RA) key
- C. Result Analysis (RA) Version
- D. Variance variant
Answer: A,B
NEW QUESTION # 39
You want to run an assessment cycle in Profitability Analysis to allocate cost center costs during period-end closing for your organization. Which of the following objects is part of the assessment cycle?
- A. Tracing factor
- B. Template
- C. Cycle iteration
- D. Sender cost objects
Answer: A
NEW QUESTION # 40
For which objects can you enter statistical key figures? Note: There are 3 correct answers to this question.
- A. Cost elements
- B. Internal orders
- C. Profit centers
- D. Functional areas
- E. Cost centers
Answer: B,C,E
NEW QUESTION # 41
You have implemented Product Cost by Sales Oder in conjunction with cost-based POC results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual cost=1000
What data does the system calculate during results analysis?
- A. "Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300"
- B. "Revenue = 1200; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 200"
- C. "Revenue = 1200; Cost of sales = 1000; Revenue surplus =200"
- D. "Revenue = 1500; Cost of sales = 1000; Revenue surplus =300"
Answer: A
NEW QUESTION # 42
How do you maintain number range intervals in Controlling?
- A. By account type
- B. By business transactions
- C. By document type
- D. By cost element category
Answer: B
NEW QUESTION # 43
What can you manage via the account assignment category? Note: There are 2 correct answers to this question.
- A. Separate sales order stock
- B. Costing variant
- C. Valuation of separate sales order stock
- D. Product cost by sales order
Answer: A,C
NEW QUESTION # 44
You post a billing document for a sales order with sales order controlling. What data flows to Profit Center Accounting? Note: There are 2 correct answers to this question.
- A. Payment Discount
- B. Order quantity
- C. Revenues
- D. Sales deductions
Answer: C,D
NEW QUESTION # 45
Which of the following statements are applicable to automatic account assignment in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. It can be defined for postings on general ledger accounts of secondary costs type.
- B. It takes precedence over validation and substitution.
- C. It can be defined for postings on general ledger accounts of primary costs type.
- D. It can be overwritten in the application.
Answer: B,C
NEW QUESTION # 46
You are creating new activity type and want to maintain plan prices for a cost center. Which attribute must you configure in the activity type master record? Note: There are 3 correct answers to this question.
- A. Activity type category
- B. Company code
- C. Price indicator
- D. CO version
- E. Valid cost center categories
Answer: A,C,E
NEW QUESTION # 47
At what level do you create the structure of the operating concern?
- A. Client level
- B. Sales organization level
- C. Controlling area level
- D. Company code level
Answer: A
NEW QUESTION # 48
You use a production order with Product Cost by Period and you entered a results analysis key and variance key. How does the system calculate variances in Product Cost by Period?
- A. Variances = Actual costs - Delivery value
- B. Variances = Target costs - Delivery value - WIP
- C. Variances = Actual costs - Delivery value - WIP
- D. Variances = Target costs - Delivery value
Answer: C
NEW QUESTION # 49
At which level do you define the valuation method for results analysis?
- A. Plant
- B. Controlling area
- C. Company code
- D. Operating concern
Answer: B
NEW QUESTION # 50
Which type(s) of Profitability Analysis update (s) the cost of goods sold at the time of delivery only?
- A. Margin analysis
- B. Combined profitability analysis
- C. Both margin analysis and costing-based
- D. Costing-based
Answer: A
NEW QUESTION # 51
You are setting up a direct internal activity allocation in SAP S4/HANA. What is valid receivers for the activity? Note: There are 3 correct answers to this question.
- A. Internal order
- B. General ledger account
- C. Profit center
- D. WBS element
- E. Sales order item
Answer: A,D,E
NEW QUESTION # 52
What are some of the characteristics of planning for internal orders? Note: There are 2 correct answers to this question.
- A. You can plan multiple versions.
- B. Availability control can check against plan values.
- C. You can define tolerance limits for plan overspend.
- D. You can enter costs and revenues.
Answer: A,D
NEW QUESTION # 53
You want to prevent reporting extreme periodic fluctuations in your P&L statement. Which Management Accounting activity should you choose to help spread irregular expenses throughout the fiscal year?
- A. Indirect activity allocation
- B. Accrual calculation
- C. Periodic reporting
- D. Budget availability control
Answer: B
NEW QUESTION # 54
How does SAP S/4HANA determine if a characteristic value is valid in Profitability Analysis?
- A. By defining the characteristic value as a value field
- B. By defining the characteristic value as a key figure
- C. By defining the characteristic value in the field catalog
- D. By defining the characteristic value in the check table
Answer: D
NEW QUESTION # 55
Which of the following statements apply to SAP S/4HANA embedded analytics? Note: There are 2 correct answers to this question.
- A. It is used by dedicated BI users who need to go beyond the capabilities of Strategic Analysis Tools for reporting.
- B. It is the core SAP S4/HANA license and users the same technical stack and user interface.
- C. It uses core data services (CDS ) views to create virtual data models (VDMs ) for reporting.
- D. It is hosted on the SAP Cloud Platform and integrate seamlessly on the SAP S4/HANA on the Fiori Launchpad.
Answer: B,C
NEW QUESTION # 56
How does SAP S/4HANA capture costs? Note: There are 2 correct answers to this question.
- A. Primary and secondary costs are captured in general ledger accounts.
- B. All primary and secondary costs are captured by creating them as cost elements.
- C. Only primary costs are captured in general ledger accounts.
- D. Secondary costs are captured as secondary cost element, and not as general ledger accounts.
Answer: A,B
NEW QUESTION # 57
You are working in the machinery industry and you consider implementing cost center budget management.
Which functions are available for cost center budget management? Note: There are 2 correct answers to this question.
- A. Availability control against monthly budget amount
- B. Budget values import with CSV file
- C. Unused budget carry-forward to next fiscal year
- D. Budget transfer from source cost center to multiple target cost centers
Answer: B,D
NEW QUESTION # 58
Which of the following statements best describe Product Cost by Order? Note: There are 2 correct answers to this question.
- A. It is used when full cost traceability is needed.
- B. It is recommended for products with a long production time.
- C. It is used when you perform repetitive manufacturing.
- D. It is used when controlling by individual production lots or discrete quantities is needed.
Answer: A,D
NEW QUESTION # 59
To which object do you assign a costing sheet?
- A. Costing variant
- B. Transfer control
- C. Cost component structure
- D. Valuation variant
Answer: D
NEW QUESTION # 60
In the Product Cost by Order process, what does the system calculate depending on the order status?
- A. Both WIP and variances
- B. WIP at target costs or variances
- C. WIP at percentage of completion (PoC) method or variances
- D. WIP at actual costs or variances
Answer: D
NEW QUESTION # 61
Which of the following statements best describe Product Cost by Period? Note: There are 2 correct answers to this question.
- A. It is used when periodic costs outweigh daily postings.
- B. It is used to analyze work in process (WIP) based on actual costs.
- C. It is used when the focus of controlling is on a stable and continuous production process.
- D. It is used in conjunction with a product cost collector.
Answer: C,D
NEW QUESTION # 62
......